Site and contract work

Kitchen and appliance fitting on multi-plot developments, tower blocks and apartment schemes — plot by plot, to a programme, with the snagging closed out before handover.

Programmes completed

More than 10,000 kitchens fitted on new-build schemes for the country's biggest kitchen companies — Symphony, Wren and Magnet. These are a few of the programmes.

420
plots on a single 12-week programme
330
kitchens across two tower blocks
10
kitchens a day is a normal rate on site
1
point of contact, start to finish

Who the work is for

Over 10,000 kitchens on new-build developments, for the biggest names in the trade:

  • Symphony — new-build kitchens, plot by plot.
  • Wren — contract and site work, including current programmes.
  • Magnet — new-build kitchen fit-outs.

Nationwide housebuilders, apartment schemes and tower blocks — the sort of work where the programme is fixed and the plots have to be signed off as you go, not at the end.

What gets taken on

  • Multi-plot kitchen fit-out — appliances in and connected, plot after plot, at production pace.
  • Appliance-only packages — if another trade hangs the units, the ovens, hobs, hoods, integrated appliances and connections can be handled separately.
  • Snagging close-out — the list at the end nobody wants. Cleared, not left.
  • Single high-spec plots — the show home, the one-off, the kitchen that has to be right first time.

Qualified electrician (City & Guilds 2381 and 2391), so hobs get hardwired properly on site rather than waiting for someone else to come back. Appliance Fitter CSCS card, so getting on site isn't the hold-up on day one. £5m public liability, own tools, and test equipment carried on every job.

Straight answers for a site manager

  • CSCS Appliance Fitter card — induction and gate access sorted.
  • On site when agreed, and on the programme until it's finished.
  • Plots signed off as they go, not all at the end.
  • Materials and fixings quoted up front, not discovered later.
  • A plot that isn't ready is flagged the same day — nobody stands around.
  • Available for programmes over the winter and into next year.
Recent work

Recent installations

Appliance packages on new-build plots and in private houses — the units fitted, and the connections behind them.

Island extractor, electric hob and oven
Island extractor, electric hob and oven
Island gas hob under a ceiling-fixed extractor
Island gas hob under a ceiling-fixed extractor
Double oven, integrated fridge-freezer, hob and chimney extractor
Double oven, integrated fridge-freezer, hob and chimney extractor
Integrated fridge-freezer, hob, oven and integrated extractor
Integrated fridge-freezer, hob, oven and integrated extractor
3 integrated ovens, hob and integrated island extractor
3 integrated ovens, hob and integrated island extractor
Two integrated ovens and a microwave, gas hob and chimney extractor
Two integrated ovens and a microwave, gas hob and chimney extractor
Built-under double oven, ceramic hob and chimney extractor
Built-under double oven, ceramic hob and chimney extractor
Combi microwave over an oven, induction hob and extractor
Combi microwave over an oven, induction hob and extractor

Real jobs, photographed on site. No stock images.

Domestic too

Same standard in a private house

The site work pays the bills; the domestic work is where the repeat customers come from. One kitchen or ten, it's the same job, done properly.

Electric hobs & hardwiring

Induction and ceramic hobs hardwired to an existing cooker point — the right cable for the load, correctly sized and properly terminated.

Built-in ovens

Single, double and integrated column ovens, combi microwaves and warming drawers — wired in, not left on a trailing lead.

Integrated appliances

Fridge-freezers, dishwashers, wine coolers, plate warmers and integrated microwaves — levelled, fixed back, doors aligned.

Washing machines & dishwashers

Freestanding or integrated. Connected, levelled, run through a cycle and checked for leaks before the job is finished.

Cooker hoods & extractors

Chimney, island and integrated extractors — ducted or recirculating — with the electrics done properly.

Gas connections

Gas is done by a Gas Safe registered engineer — booked in alongside the electrics so it all happens on the same visit.

Got a programme starting?

Send the plots, the dates and the scope, and you'll have a rate and a realistic finish date back.

Free quote 07716 139552 Email instead

Mon–Fri 8am–6pm · Sat 8am–1pm

Call Free quote